ISO 9001/14001/18001 Certified

Frontpage Slideshow | Copyright © 2006-2011 JoomlaWorks Ltd.

 

Project Name. SAWAN OIL GAS FIELD ACCESS ROAD
Location. Sawan Gas & Oil Field, Chundko, Pakistan
Client OMV

Scope of Work.
Total length of Road = 23 Km
Embankment Cut = 118,000 M3
Up-grade preparations = 343,00 M2
Gravel Sub-base (150 mm) = 314,000 M2
Prime coat = 185,000 M2
50 mm Dence Graded AC = 14 18,500 M2
Pavement Marking = 23,500 m
RCC Pip Culverts = 670 m

The Group

The Associates