Design and construction of control buildings involving blast resistant design and fixtures |
 |
Complete HVAC, Electrical, plumbing and mechanical work |
 |
Detailed engineering, fabrication, erection and testing of under ground drainage and fire fighting pipline,4”~20” = 175,000 dia inches |
 |
4000 tons steel Structure Fabrication and erection in less then 4 month |
 |
Construction of foundation for fuel oil tanks |
 |
Construction of dike walls for fuel oil tanks |
 |
Construction of water drainage system for the entire plant |
 |
Installation of Cathodic protection system for tanks and pipe lines |
 |
Installation and testing of HDPE Membrane under the tank foundation and dikes |
 |
Construction of internal plant roads involving asphalitic concrete equal to 200,000 Tons |
 |
Construction and erection of precast pipe racks |
 |
Construction of Pedestal for pipeline |
 |
Installation of fire fighting sprinkle system at multiple location including the product storage building |